|
Home
>
FAQ
>
Run Time
|
Previous
Next
|
|
|
|
|
|
Is there a possibility to continue a simulation after a power-failure?
The only option one have to continue a simulation that has been terminated is to use
the switch /PR:X to start a simulation at the particular projection number X. However,
the data in the RES and the energy spectrum will be based on this point and forward so
if you want to simulate an energy spectrum that corresponds to the average of all
projection the using this switch will be to correct. You have to give the command
exactly as the initial command and only add the /PR switch
|
|
|
|
|
|